| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 28(1); 2000 > Article
Journal of Korean Society for Quality Management 2000;28(1): 210-.
장기사용 발전소 제어시스템의 예비모듈 수 결정 사례
정창기1, 신윤오1, 박정원2, 함중걸2
1전력연구원 발전연구실 발전계전그룹
2산업기술시험원 기술감리본부 신뢰성평가팀
A Case Study on Determining the Number of Spare Modules in Power Plant Control System Used for Long Term
ABSTRACT
When an electronic control system has been used for long time, the electronic control system becomes obsolete and no longer In production. In this case, the existing control system should replace by new system due to shortage of spare modules. However, if the proper number of spare modules are stocked, it may be possible and more economical than to replace by new system to extend the usage period of the existing control system. In this case, it is an important problem to determine the proper number of spare modules. In this paper, a method to determine the proper number of spare modules is presented with an application example.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,400
View
1
Download
Related article
A Case Study of the Construction of Smart Factory in a Small Quantity Batch Production System: Focused on IDIS Company  2018 March;46(1)
Editorial Office
1806, 310, Gangnam-daero, Gangnam-gu, Seoul, 06253, Korea
TEL: +82-2-563-0357   FAX: +82-2-563-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next