Journal of Korean Society for Quality Management 2002;30(3): 53-. |
두 가지 고장형태를 고려한 생산 및 예방보전 정책 |
김호균1, 조형수2 |
1동의대학교 산업공학과 2부산대학교 BK21 로지스틱스 사업팀 |
A Production and Preventive Maintenance Policy with Two Types of Failures |
|
|
|
|
ABSTRACT |
This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided. |
Key Words:
EMQ Model;Preventive Maintenance;Major(minor) Failure;Minimal Repair; |
|
|
|