| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 36(2); 2008 > Article
Journal of Korean Society for Quality Management 2008;36(2): 28-.
중소 제조기업을 위한 엑셀기반 스케쥴링 시스템
이창수1, 최경일2, 송영효3
1동북익스프레스 전략연구소
2한국외국어대학교 산업경영공학부
3홍익대학교 상경대학
An Excel-Based Scheduling System for a Small and Medium Sized Manufacturing Factory
Chang-Su Lee1, Kyung-Il Choe2, Young-Hyo Song3
1Strategy Institute, Dongbu Express, Dongbu Financial Center
2School of Industrial and Management Engineering, Hankuk University of Foreign Studies
3School of Business, Hongik University
ABSTRACT
This study deals with an Excel-based scheduling system for a small and medium sized manufacturing factory without sufficient capability for managing full-scale information systems. The factory has the bottleneck with identical machines and unique batching characteristics. The scheduling problem is formulated as a variation of the parallel-machine scheduling system. It can be solved by a two-phase method: the first phase with an ant colony optimization (ACO) heuristic for order grouping and the second phase with a mixed integer programming (MIP) algorithm for scheduling groups on machines.
Key Words: Parallel Machine Scheduling;Excel-Based Scheduling;Ant Colony Optimization;
Editorial Office
13F, 145, Gasan digital 1-ro, Geumcheon-gu, Seoul 08506, Korea
TEL: +82-2-2624-0357   FAX: +82-2-2624-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next