| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 15(1); 1987 > Article
Journal of Korean Society for Quality Management 1987;15(1): 76-.
수리일정계획(修理日程計劃)과 보수반원(補修班圓)크기의 동시적(同時的) 결정(決定)에 관한 연구(硏究)
김길동1, 조암2, 이진규2
1동국대학교 산업공학과 대학원
2동국대학교 산업공학과
On the Simultanously Determining the Schedule and Crew Size for Optimal Preventive Maintence
Gil-Dong Kim1, Am Jo2, Jin-Gyu Lee2
1
2
ABSTRACT
Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper suggests a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies.
TOOLS
PDF Links  PDF Links
Full text via DOI  Full text via DOI
Download Citation  Download Citation
Share:      
METRICS
1,364
View
5
Download
Related article
Editorial Office
1806, 310, Gangnam-daero, Gangnam-gu, Seoul, 06253, Korea
TEL: +82-2-563-0357   FAX: +82-2-563-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next