Journal of Korean Society for Quality Management 1987;15(1): 76-. |
수리일정계획(修理日程計劃)과 보수반원(補修班圓)크기의 동시적(同時的) 결정(決定)에 관한 연구(硏究) |
김길동1, 조암2, 이진규2 |
1동국대학교 산업공학과 대학원 2동국대학교 산업공학과 |
On the Simultanously Determining the Schedule and Crew Size for Optimal Preventive Maintence |
Gil-Dong Kim1, Am Jo2, Jin-Gyu Lee2 |
1 2 |
|
|
|
ABSTRACT |
Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper suggests a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies. |
|
|
|