| Home | E-Submission | Sitemap | Editorial Office |  
top_img
Journal of Korean Society for Quality Management > Volume 33(1); 2005 > Article
Journal of Korean Society for Quality Management 2005;33(1): 88-.
스폿 용접공정의 TIP 수명 향상을 위한 6시그마 프로젝트 사례
이민구1, 곽효창2
1충남대학교 정보통계학과
2(주)카테크 기술연구소
A Case Study of Six Sigma Project for Improving TIP Life Time in a Spot Welding Process
Min-Koo Lee1, Hyo-Chang Kwag2
1Department of Information and Statistics, Chungnam National Univeristy
2R&D Center, Kartek Co. Ltd.
ABSTRACT
This paper considers a six sigma project for improving the TIP life time in a spot welding process. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A process map is used to identify process input and output variables. Nine key process input variables are selected by using C&E matrix and FMEA, and finally four vital few input variables are selected from analyze phase. The optimum process conditions of the vital few input variables are jointly obtained by maximizing TIP life time using DOE and alternative selection method.
Key Words: Six Sigma;TIP Life Time;Spot Welding;
Editorial Office
1806, 310, Gangnam-daero, Gangnam-gu, Seoul, 06253, Korea
TEL: +82-2-563-0357   FAX: +82-2-563-0358   E-mail: ksqmeditor@ksqm.org
About |  Browse Articles |  Current Issue |  For Authors and Reviewers
Copyright © The Korean Society for Quality Management.                 Developed in M2PI
Close layer
prev next