|
Journal of Korean Society for Quality Management 2010;38(3): 439-. |
자동차 부품 제조업체의 조립라인 개선을 위한 6시그마 프로젝트 사례 연구 |
정민영, 이영남, 홍성훈 |
전북대학교 산업정보시스템공학과 |
A Case Study of a Six Sigma Project for Improving Assembly Line of Auto-Part Manufacturing Company |
Min-Young Jung, Young-Nam Lee, Sung-Hoon Hong |
Department of Industrial & Information Systems Engineering, Chonbuk National University |
|
|
|
ABSTRACT |
Since the six sigma strategy was first introduced to Motorola in 1987, it has been taken as an important business strategy to strengthen the competitiveness of leading companies in the global competitiveness environm ent. This paper presents a six sigma project to reduce the cycle time of assembly line in a medium size automotive part company. The project follows a structured methodology of DMAIC cycle which consists of Define, Measure, Analyze, Improve, and Control. A CTQ is determined based on COPQ analysis, and a process map is utilized for identifying process input variables. As a result of the project, two assembly lines are converted to cell line production lines. The cycle times become 55 sec./unit and 64 sec./unit from 64 sec./unit and 83 sec./unit at the beginning of the project, respectively. |
Key Words:
Cell Line Production Line;Cycle Time;DMAIC;KPIVs;Six Sigma Project; |
|
|
|